Need help? Message us

External Wall Insulation in North Dublin

House wrapping for homes from Malahide and Swords to Artane, Drumcondra and Clontarf. SEAI grants of up to €8,000 and a free site survey.

External wall insulation for North Dublin homes

OSBER installs external wall insulation across North Dublin, from the coastal towns of Malahide, Portmarnock, Howth and Sutton to the estates of Artane, Coolock, Raheny, Santry, Finglas and Swords. Recent North Dublin jobs include Seabury Lane in Malahide, Montrose Close in Artane and a house in Dublin 9. You can see the photos from each one in our projects gallery.

This page covers what is different about North Dublin houses, what a job costs and what grant you can expect. For the full detail on the system itself, see our main page on external wall insulation Dublin. We also cover the other side of the city: external wall insulation in South Dublin, plus Kildare, Meath and Wicklow. The full list of service areas is here.

External Wall Insulation Services Seabury Lane, Malahide Dublin K36

Why North Dublin houses suit external insulation

Many of the semi-detached and terraced houses built across Artane, Coolock, Raheny, Santry and Finglas from the 1950s to the 1970s have hollow block walls. There is no proper cavity to pump, so the two real options are insulating on the inside or wrapping the outside. Wrapping keeps every room the same size, covers the whole wall in one unbroken layer and lets you stay in the house while the work is done.

Homes along the coast in Malahide, Portmarnock, Howth and Sutton take more wind and driven rain than houses further inland. The render finish on an external system gives those walls a new weather-resistant face as well as the insulation behind it. We confirm your wall type and its condition at the survey before recommending anything.

OSBER's external wall insulation project in Dublin 9, Ireland

Benefits of External Wall Insulation

What the job involves, how long it takes and what it costs

The work

  1. Survey the walls, check their construction and condition, and agree the finish.
  2. Fix insulation boards to the outside of the house with adhesive and mechanical fixings.
  3. Apply a reinforcing mesh and base coat.
  4. Finish with a weather-resistant render in the colour you choose, then refit gutters, downpipes and sills.

How long it takes

Most houses take 5 to 14 working days, depending on size, access and the weather. All of the work is outside, so you do not need to move out.

Typical costs and SEAI grants

  • Mid-terrace house: €12,000 to €20,000, with an SEAI grant of €3,500.
  • Semi-detached house: €18,000 to €30,000, with an SEAI grant of €6,000.
  • Detached house: €25,000 to €50,000, with an SEAI grant of €8,000.

Grant amounts are correct as of October 2026. OSBER is registered with SEAI, handles the grant application with you and deducts the grant from your final invoice. For a fuller breakdown, read our external wall insulation cost guide or try the SEAI grant calculator.

Book a free survey

Want a price for your house in North Dublin? Book a free site survey and we will check your walls, measure up and give you a written quote with the grant already worked out. Contact OSBER or call 01-485-3090.

Services

Recent North Dublin projects

Frequently Asked Questions

All of it, including Malahide, Swords, Portmarnock, Howth, Sutton, Baldoyle, Raheny, Clontarf, Artane, Coolock, Santry, Drumcondra, Glasnevin, Finglas and Balbriggan. Our crews work across the whole county from our base in Greenogue Business Park.

Houses built in Dublin between the 1950s and the 1980s often do. Signs include walls about 225mm thick and a BER report that lists hollow block. You do not need to work it out yourself: we check the wall construction at the survey.

As of October 2026 the grant is €3,000 for an apartment, €3,500 for a mid-terrace house, €6,000 for a semi-detached or end-of-terrace house and €8,000 for a detached house. We deduct it from your invoice.

Often not for a standard house, but it can be needed if the house is a protected structure, sits in an Architectural Conservation Area, or the work changes how the front of the house looks. Fingal County Council or Dublin City Council can confirm for your address. Our guide to planning permission for external wall insulation explains the rules.

Most houses take 5 to 14 working days. Larger detached homes, difficult access and bad weather can add time. We give you a programme before we start.

Yes. Photos from our Malahide, Artane and Dublin 9 jobs are in the projects gallery, alongside work in other parts of Dublin, Meath and Wicklow.